000 | 02914cam a2200397 i 4500 | ||
---|---|---|---|
001 | on1256152159 | ||
003 | OCoLC | ||
005 | 20240726104845.0 | ||
008 | 210613t20212021dcuao ob 000 0 eng d | ||
040 |
_aDID _beng _erda _epn _cDID _dOCLCO _dOCLCF _dUKAHL _dYDX _dNT _dOCLCQ _dNT |
||
020 | _a9780309258036 | ||
020 |
_a9780309259385 _q((electronic)l(electronic)ctronic) |
||
043 | _an-us--- | ||
050 | 0 | 4 |
_aUC263 _b.P694 2021 |
049 | _aMAIN | ||
245 | 1 | 0 | _aPowering the U.S. Army of the future /Committee on Powering the U.S. Army of the Future, Board on Army Research, and Development Division on Engineering and Physical Sciences. |
300 |
_a1 online resource (approximately 151 pages) : _bcolor illustrations, color photographs |
||
336 |
_atext _btxt _2rdacontent |
||
337 |
_acomputer _bc _2rdamedia |
||
338 |
_aonline resource _bcr _2rdacarrier |
||
347 |
_adata file _2rda |
||
500 | _a"Prepublication copy - subject to further editorial correction." | ||
504 | _a1 | ||
505 | 0 | 0 |
_aIntroduction. -- _t1 The Multi-Domain Operations and the 2035 Operational and Technology Environment. -- _t2 The Power and Energy Technology Assessment Criteria. -- _t3 Energy Sources, Conversion Devices, and Storage. -- _t4 System Wide Communication Issues in Support of Multi-Domain Operations. -- _t5 Dismounted Soldier Power and Light Unmanned Aerial Vehicles and Unmanned Ground Vehicles. -- _t6 Vehicle Power and Large Weapon Systems. -- _t7 Forward Operating Base Power. -- _t8 Fuel Conversion Efficiency and Other Material Driven Opportunities. -- _t9 Findings, Conclusions, and Recommendations. -- _tAppendices. |
520 | 0 | _aThis report examines the U.S. Army's future power requirements for sustaining a multi-domain operational conflict and considers to what extent emerging power generation and transmission technologies can achieve the Army's operational power requirements in 2035. The study was based on one operational usage case identified by the Army as part of its ongoing efforts in multi-domain operations. The recommendations contained in this report are meant to help inform the Army's investment priorities in technologies to help ensure that the power requirements of the Army's future capability needs are achieved. | |
530 |
_a2 _ub |
||
610 | 1 | 0 |
_aUnited States. _bArmy _xFuel _xForecasting. |
610 | 1 | 0 |
_aUnited States. _bArmy _xEnergy consumption _xEvaluation. |
610 | 1 | 0 |
_aUnited States. _bArmy _xOperational readiness _xForecasting. |
650 | 0 |
_aVehicles, Military _zUnited States _xFuel consumption _xEvaluation. |
|
655 | 1 | _aElectronic Books. | |
856 | 4 | 0 |
_zClick to access digital title | log in using your CIU ID number and my.ciu.edu password. _uhttpss://search.ebscohost.com/login.aspx?direct=true&scope=site&db=nlebk&db=nlabk&AN=3077689&site=eds-live&custid=s3260518 |
942 |
_cOB _D _eEB _hUC _m2021 _QOL _R _x _8NFIC _2LOC |
||
994 |
_a92 _bNT |
||
999 |
_c80650 _d80650 |
||
902 |
_a1 _bCynthia Snell _c1 _dCynthia Snell |